OR-FM 3015 ,how is a complete machine assembled step by step? Let’s check the video.
Step1. Disassemble the package and count the delivered.
Step2. Clean up installation site, put the machine on the ground, install foot bolt, keep the machine level.
Step3. Organize circut, install sheet metal and tank chain. Install laser and laser head.
Step4. Install sheet metal and computer monitors, install the oil pump, install water cooler.
source
Oree Laser & Fiber Laser Cutting Machine & Installation Demonstration
